X3T9.2 Documents (Proposals) Online


The X3T9.2 1992 documents are:

Document
Number
Description Author File Size Mailing
92-001R0.PDF X3T9.2 1991 Annual Report J. Lohmeyer 62687[1/21/92]
92-002R0.PDF Standardization Activities in ISO/IEC JTC 1/SC 25/WG 4 SC 25/WG 4 Secretariat 556361[1/21/92]
92-003R0.PDF Draft Report of 2nd Mtg of WG 4 held in Bremen, Germany 9/30-10/2 1991 SC 25/WG 4 Secretariat 5957726[1/21/92]
92-004R0.PDF Cable Impedance Revisited B. Spence 944642[1/21/92]
92-005R0.TXT Houston Working Group Minutes Lamers/Lohmeyer 11946[1/21/92]
92-006R1.TXT Enhancement of Sequential Access Command Set for Medium Changers K. Jones 9226[9/15/92]
92-007R1.PDF Proposed SCSI Identifier Symbols V. Novak 330511[3/24/92]
92-008R0.PDF An Introduction to X3T9 and I/O Interface Standards W. Burr 8830265[1/21/92]
92-009R0.PDF ltr to Mr. Mori responding to his questions in 91-170 L. Lamers 554471[1/21/92]
92-010R0.PDF PCMCIA IDE Host Interface Implementation Guide T. Hanan 1482020[1/21/92]
92-011R0.PDF DMA data transfer method as outlined in AT Attachment C. Runowicz 2197394[1/21/92]
92-012R0.PDF CA Clearing Commands J. Williams 372213[1/21/92]
92-013R0.PDF Conflicting Statement on CA and Queue Suspension J. Williams 271600[1/21/92]
92-014R0.PDF Previewing Linked Commands in SCSI-3 E. Gardner 504764[1/21/92]
92-015R0.PDF The Meaning of Linked Commands in SCSI-3 E. Gardner 390360[1/21/92]
92-016R0.PDF SCSI-3 Connector Presentation C. Mosley 1599613[1/21/92]
92-017R0.PDF Signal Line Increased Current Kicker F. Samela 1348447[1/21/92]
92-018R0.TXT DADI Working Group Minutes 1/13/92 L. Lamers 4908[1/21/92]
92-019R1.TXT SCSI-3 Queuing Working Group Minutes 1/13/92 Penokie/Lamers 7800[1/21/92]
92-020R0.TXT SPI Working Group Minutes for January 1992 B. Spence 11313[1/21/92]
92-021R0.TXT SPP Working Group Minutes 1/15/92 J. Lohmeyer 4179[1/21/92]
92-022R0.TXT SPI Connector Contact Working Group Minutes 1/15/92 Penokie/ Mosley 4020[1/21/92]
92-023R0.PDF Serial Storage Architecture M. Mitoma 279976[1/21/92]
92-024R0.PDF A Serial Link for Storage Subsystems (presentation) I. Judd 2968171[1/21/92]
92-025R0.PDF A Serial Link for Storage Subsystems (paper) I. Judd 2083867[1/21/92]
92-026R0.PDF Serial Storage Architecture SSA-0 (Transport Layer) Ver 1.0 C. Butterworth 13796770[1/21/92]
92-027R0.PDF Serial Storage Architecture SSA-1 (Disk Order Level) Ver 1.0 C. Butterworth 7293398[1/21/92]
92-028R0.PDF Fast Single Ended SCSI Terminator Concept -- Active Negation Emulator M. Jordan 2855011[1/21/92]
92-029R0.TXT Translation of IPI-3 Command Queueing to SCSI Language Dal Allan 6566[1/21/92]
92-030R0.TXT SPP Architectural Meeting January 27-28, 1992 L. Lamers 9003[3/24/92]
92-031R0.TXT Alternate P-Cable Connector for SCSI-3 Smyers, Neer, & Newsom 2255[3/24/92]
92-032R0.PDF Fast SCSI Timing Problems and Solutions K. Chan 1077265[3/24/92]
92-033R0.TXT Proposed Requirements for SCSI-3 devices which use P1394 Physical I/F S. Smyers 2788[3/24/92]
92-034R0.PDF DMA Meeting at HP-PCG on 1/24/92 J. P. McGrath 1018737[3/24/92]
92-035R2.TXT SCSI-3 P-Connector Requirements G. Penokie C Mosley 2031[5/14/92]
92-036R0.PDF Termination of Reserved Lines B. Spence 230418[3/24/92]
92-037R0.PDF Specifications for SPI Transceivers B. Ham 340013[3/24/92]
92-038R0.PDF Proposal for Glitch Immunity Specification F. Oprescu 786620[3/24/92]
92-039R0.PDF Microsoft concerns with the CAM XPT/SIM document A. Crick 290366[3/24/92]
92-040R0.TXT X3T9.2 Meeting #98 Minutes -- February 17, 1991 Lamers/Lohmeyer 112374[3/24/92]
92-041R0.TXT Austin Queuing Working Group Minutes Lamers/Penokie 4693[3/24/92]
92-042R0.PDF International Participation Fee R. Gibson 5574088[3/24/92]
92-043R0.TXT SPI Working Group Minutes for February 1992 Spence/Lamers 15295[3/24/92]
92-044R0.TXT May 1992 Working Group Announcement J. Tecco 1446[3/24/92]
92-045R1.PDF Introduction to Packetized SCSI Charles Monia 6252410[5/14/92]
92-046R1.TXT Request for new Additional Sense Codes G. Houlder 861[3/24/92]
92-047R0.TXT Request for Sequential-Access Density Codes E. Gardner 2553[3/24/92]
92-048R0.PDF Molex Pin Chamfer Proposal J. McGrath 445921[3/24/92]
92-049R0.PDF SCSI-3 Connector C. Mosley 2164435[3/24/92]
92-050R0.PDF 8-bit Drives Within a 16-bit SCSI System B. Spence 208449[3/24/92]
92-051R0.PDF Presentation on Alternative Ribbon Connector for SCSI-3 T. Newsom 1823387[3/24/92]
92-052R0.PDF IBM Procurement Specification on Mini Ribbon D Shell Connector T. Newsom 3267274[3/24/92]
92-053R0.PDF Burndy Specification on Microshield (tm) Receptacle T. Newsom 1678781[3/24/92]
92-054R0.PDF AMP Specification on Receptacle Assembly, 60 Position, Champ .050 T. Newsom 1087982[3/24/92]
92-055R0.PDF Molex Specification on Mini Ribbon Shell Shielded Connector T. Newsom 2288607[3/24/92]
92-056R0.PDF Proposal to modify Device Type 0 to support Media Interchange A. Wilhelm 3018944[3/24/92]
92-057R0.PDF Proposal for SCSI Cable Performance Specification T. Debiec 971012[3/24/92]
92-058R0.PDF Statement re US patent of Glitch remover circuit C. Ghest 550366[3/24/92]
92-059R0.PDF Electrical Impacts of SCSI Hot Plugging B. Ham 5960635[3/24/92]
92-060R0.TXT ltr re PCMCIA/ATA Proposal, dated February 24, 1992 J. Lohmeyer 4506[3/24/92]
92-061R0.PDF SCSI ACK Net with Wired-OR Driver T. Asami 521832[3/24/92]
92-062R0.PDF Differential Fast Synchronous Timing K. Chan 211214[3/24/92]
92-063R1.PDF Integral Peripherals 68 Pin IDE Pinout J. Blagaila 556609[7/15/92]
92-064R0.PDF PCMCIA IDE Drive Auto Select Proposal Hanan & Abrahamsson 274146[3/24/92]
92-065R1.PDF Support for Greater than 528MB ATA Drive S. Shah 784593[7/15/92]
92-066R0.PDF IBM 9333 SCSI Mapping 2121405[3/24/92]
92-067R0.PDF SSA-PH Appendix Daisy Chain J. Best 3503948[3/24/92]
92-068R0.PDF 3M High-Density .050' 'D' Ribbon Style Interconnect System B. Herron 1906388[3/24/92]
92-069R0.PDF Madison Cable Impedance Variations B. Bellino 502402[3/24/92]
92-070R0.TXT ATA Extensions Working Group Minutes 3/16/92 L. Lamers 7457[3/24/92]
92-071R0.TXT X3T9.2 General Working Group Minutes 3/16-18/92 Lamers/Lohmeyer 17678[3/24/92]
92-072R0.TXT SPI Working Group Minutes for March 1992 Lamers/Spence 11902[3/24/92]
92-073R0.PDF ltr to Don Laughry re IEE MSC/X3T9 Memory Attach Strategy D. Shoemaker 319121[3/24/92]
92-074R0.TXT Public Review Comment on AT Attachment (BSR X3.221) S. Shah 17910[3/15/92]
92-075R0.TXT Creating a TIB for SCSI-2 Tag Queuing working model. J. Gallant 1996[3/24/92]
92-076R0.TXT Connector Contact Working Group Meeting Minutes 3/16/92 G. Penokie 2185[3/24/92]
92-077R0.TXT Response to M. Freeman of MSC on his 4/6/92 letter John Lohmeyer 1654[5/14/92]
92-078R0.PDF Letter to John Lohmeyer on MAT/MSC P1265 M. Freeman 340245[5/14/92]
92-079R0.PDF SCSI-3 Architecture Model (SAM) Charles Monia 1969824[5/14/92]
92-079R1.PDF SCSI-3 Architecture Model (SAM) Charles Monia 3345146[7/15/92]
92-079R6 working draft of the SCSI-3 Architecte Model (SAM) Charles Monia Missing[ ]
92-079R7 working draft SCSI-3 Architecte Model (SAM) Charles Monia Missing[ ]
92-079R8 working draft of the SCSI-3 Architecte Model (SAM) Charles Monia Missing[ ]
92-079R9 working draft SCSI-3 Architecte Model (SAM) Charles Monia Missing[ ]
92-080R0.PDF DS-Links Technical Information F. Crowell 20440006[5/14/92]
92-081R0.PDF Transmittal of Public Review Comment #1 ATA Lynn Barra 945369[5/14/92]
92-082R0.PDF Approval of Project Proposal for AT Attachements Extensions Lynn Barra 224817[5/14/92]
92-083R2.PDF Request for Sequential Access Density Codes S. Washburn 234231[7/15/92]
92-083R2.PDF Request for Sequential Access Density Codes S. Washburn 234231[5/14/92]
92-084R1.TXT Preparing Documents for Committee Mailings L. Lamers 5170[5/14/92]
92-085R0.PDF Change Inquiry Command G. Penokie 677644[5/14/92]
92-085R3.TXT Change Inquiry Mode Page G. Penokie 5461[ ]
92-085R5.PDF Change Inquiry Mode Page G. Penokie 536128[11/15/92]
92-086R0.PDF SCSI Implementation in a 3.3 volt Environment D.W. Spence 623467[5/14/92]
92-087R0.PDF Key Changes Proposed for the SPI Standard D.W. Spence 506518[5/14/92]
92-088R0.TXT Two Changes for the CAM document J. Gallant 24148[5/14/92]
92-089R0.PDF Status of IEC 48B Standards Efforts D. Rundle 275969[5/14/92]
92-090R0.PDF Presentation Foils of Serial DS-Link Technology F. Crowell 1542337[5/14/92]
92-091R0.PDF Tolerance Analysis of P-cable Connection J. McGrath 884122[5/14/92]
92-092R0.TXT Letter to M. Freeman on Grass Roots J. Lohmeyer 1461[5/14/92]
92-093R0.PDF SCSI-3 Connectors Framework B. Ham 1164161[5/14/92]
92-093R1.PDF SCSI-3 Connector Framework B. Ham 1764355[7/15/92]
92-093R2.PDF SCSI-3 Connector Framework B. Ham 2224785[7/15/92]
92-094R0.TXT Information Package on 1988 Connector Decision I. Dal Allan 11506[5/14/92]
92-095R1.PDF Minutes of X3T9.2 Plenary Meeting #99 Lamers/Lohmeyer 10220441[5/14/92]
92-095R2.TXT Minutes of X3T9.2 Plenary Meeting #99 Lamers/Lohmeyer 137993[ ]
92-096R0.PDF Pin Capacitance of a SCSI Controller LSI T. Asami 360446[5/14/92]
92-097R0.PDF Requirement for Glitch Free Power Up/Down B. Ham 300096[5/14/92]
92-098R0.PDF IEEE P1285 PAR M. Freeman 742718[5/14/92]
92-099R0.TXT Connector Agenda Items I. Dal Allan 5612[5/14/92]
92-100R0.TXT SPI Working Group Minutes for April 1992 Spence/Lamers 17085[5/14/92]
92-101R1.PDF Project Proposal for SCSI-3 Generic Packetized Protocol D. Allan 15497[5/14/92]
92-102R1.PDF Project Proposal for SCSI-3 Serial Bus Protocol D. Allan 15838[5/14/92]
92-103R1.PDF Project Proposal for SCSI-3 Fiber Channel Protocol D. Allan 15796[5/14/92]
92-104R0.PDF Project Proposal for SCSI-3 Architecture Model D. Allan 1147946[5/14/92]
92-104R1.PDF Project Proposal for SCSI-3 Architecture Model D. Allan 15489[ ]
92-105R1.PDF Project Proposal for SCSI-3 Primary Commands D. Allan 15790[9/15/92]
92-106R1.PDF Project Proposal for SCSI-3 Block Commands D. Allan 15520[9/15/92]
92-107R1.PDF Project Proposal for SCSI-3 Stream Commands D. Allan 15581[9/15/92]
92-108R1.PDF Project Proposal for SCSI-3 Graphic Commands D. Allan 15552[9/15/92]
92-109R1.PDF Project Proposal for SCSI-3 Medium Changer Commands D. Allan 15643[9/15/92]
92-110R0.TXT IDE (ATA) Document Changes D. Smythe 2901[5/14/92]
92-111R1.TXT Additional ASC/ASCQ Codes for Data Compression Peter Dougherty 1054[9/15/92]
92-112R0.PDF Proposal for Alternate 68 Position P Connector Scott Smyers 6510456[5/14/92]
92-113R1.TXT April 28 SCSI-2 Queuing TIB Working Group Meeting Minutes John A. Gallant 5034[5/14/92]
92-114R0.PDF Transceiver skew recommendations Kurt Chan 269951[5/14/92]
92-115R0.PDF Cable length requirements Kurt Chan 326581[5/14/92]
92-116R1.PDF Packetized SCSI System Models Charles Monia 1241058[7/15/92]
92-117R0.TXT Fast SCSI Stubs Dimensions & Specifications Format D. W. Spence 1501[7/15/92]
92-118R0.PDF 3M Presentation on MDR Connector Robert Herron 1969946[5/14/92]
92-119R0.PDF ATA Extensions Proposal -- ATA 68 Pin Connection Thomas Newman 409088[7/15/92]
92-120R0.PDF Mapping the ATA Interface onto thd SFF 68-pin Connector John Geldman 384968[7/15/92]
92-121R0.PDF ATA Command 0 (No Operation) Proposal Thomas Newman 327089[7/15/92]
92-122R0.TXT Proposal for Additional Annex for SPI Standard D.W. Bill Spence 6356[7/15/92]
92-123R0.TXT Proposed Change to SPI Kevin Gingerich 2723[7/15/92]
92-124R0.TXT Proposed Change to SPI Steve Hunley 1798[7/15/92]
92-125R0.PDF Letter on Patents to Steve Cornaby I. Dal Allan 259297[7/15/92]
92-126R0.TXT Minutes of the X3T9.2 May General Working Group L. Lamers 20671[7/15/92]
92-127R0.TXT SPI Working Group Minutes for May 1992 Lamers/Spence 15689[7/15/92]
92-128R0.PDF Raw Cable Impedance and Bend Radius Test Results Rich Mizia 1297320[7/15/92]
92-129R0.TXT P-Cable connector dimension & tolerance study R. Whiteman 3326[7/15/92]
92-130R0.PDF Sychronization Status & Errors Kyle Robison 1298333[7/15/92]
92-130R2.PDF Sychronization Status & Errors Kyle Robison 33253[1/15/93]
92-131R1.PDF A Common Command Unit Architecture S. Smyers 25877324[9/15/92]
92-132R0.TXT Transmittal of Public Review Comment #2 (ATA) Lynn Barra 12143[7/15/92]
92-133R0.PDF Proposal to add disconnect unconditionally after command phase mode bit Scott Smyers 470461[7/15/92]
92-133R3.PDF Proposal to add disconnect unconditionally after command phase mode bit Scott Smyers 601177[9/15/92]
92-133R7.TXT Disconnect control on initial connection Scott Smyers 4580[3/15/93]
92-133R8.TXT Disconnect control on initial connection Scott Smyers 4517[3/15/93]
92-134R0.PDF Response to 92-111 (ASC/ASCQ for Data Compression) Jeffrey Williams 293315[7/15/92]
92-134R1.TXT Response to 92-111 Jeffrey Williams 822[9/15/92]
92-135R0.PDF SCSI-3 Serial Bus Protocol (SBP) Ed Gardner 1511386[9/15/92]
92-136R0.PDF Internal Non-Shielded Connectors H. Waltersdorf & S. Roland 221025[7/15/92]
92-137R0.TXT Hot Plugging Requirements for SPI B. Ham 4738[7/15/92]
92-138R1.TXT Single SCSI cable for all forms of SCSI B. Ham 3297[7/15/92]
92-139R0.PDF Blind-pluggable connector S. Cornaby 575873[7/15/92]
92-139R1.PDF Appendix for SPI on Unitized Connector S. Cornaby 945292[9/15/92]
92-140R0.PDF Transmittal of Public Review Comment #3 (ATA) Lynn Barra 1725722[7/15/92]
92-141R1.PDF SCSI-3 Queuing Model G. Penokie 3209443[9/15/92]
92-141R5.TXT SCSI-3 Queuing Model G. Penokie 26863[11/15/92]
92-141R6.TXT SCSI-3 Queuing Model G. Penokie 28083[6/15/93]
92-141R7.PDF SCSI-3 Queuing Model G. Penokie 2690525[10/15/93]
92-141R8.TXT SCSI-3 Queuing Model G. Penokie 24571[ ]
92-142R0.PDF ATA Public review comments J. P. McGrath 7197[9/15/92]
92-143R0.PDF Capacitance on SCSI Signal Lines J. P. McGrath 8165[9/15/92]
92-144R0.PDF Minutes of X3T9.2 Plenary Meeting #100 L. Lamers 86645[7/15/92]
92-145R0.PDF SCSI mapping for SSA John Scheible 4780120[9/15/92]
92-146R0.PDF Public Review Comment #1 on SCSI-2 Lynn Barra 296471[9/15/92]
92-147R0.PDF Response to SCSI-2 Public Review Comment #1 Del Shoemaker 555187[9/15/92]
92-147R1.PDF Response to SCSI-2 Public Review Comment #1 Del Shoemaker 5272[ ]
92-148R2.PDF Active Negation Driver Requirements for SPI D. Steele 57730[9/15/92]
92-149R1.PDF Demand Mode DMA ATA John Geldman 303086[9/15/92]
92-150R0.PDF Cable Document Tom Debiec 12963[ ]
92-150R1.PDF Cable Document Tom Debiec 414836[11/15/92]
92-151R0.PDF Two new commands for ATA Mehran Raezani 178705[9/15/92]
92-152R0.PDF DMA Timing Changes In ATA Mehran Ramezani 375897[9/15/92]
92-153R0.PDF Comments on Blind-pluggable Connector Edward A. Gardner 805267[9/15/92]
92-154R0.PDF Project Proposal for Common Access Method 2 (CAM-2) J. Gallant 1124410[9/15/92]
92-154R1.TXT Project Proposal for Common Access Method 2 (CAM-2) J. Gallant 6367[11/15/92]
92-155R0.TXT Connector Requirements C. Mosley 2112[9/15/92]
92-156R0.PDF SCSI Termination Sensing Proposal Florin Oprescu 284688[9/15/92]
92-157R5.TXT LBA address for ATA Shashir Shah 20853[11/15/92]
92-158R0.TXT Minutes of July 1992 General Working Group L. Lamers 16665[9/15/92]
92-159R0.TXT SPI Working Group MInutes D.W. Spence 16521[9/15/92]
92-160R0.PDF TI Constant Current Mode Terminator Dean Wallace 4367728[11/15/92]
92-161R0.PDF Termination Sensing Proposal Florin Oprescu 692938[9/15/92]
92-162R1.TXT New ASC/ASCQ for Power-on Reset G. Houlder 965[9/15/92]
92-163R0.PDF Domain Definitions and Linked Commands (SAM) Charles Monia 849393[9/15/92]
92-164R1.TXT Request for Addition of New Density Codes J. Williams 1495[11/15/92]
92-165R0.PDF Serial Cable Protypes R. Gannon 2283[11/15/92]
92-166R0.PDF Minutes of X3T9.2 Plenary Meeting #101 L. Lamers 84140[9/15/92]
92-167R0.PDF Proposed SPARC Policy on Conformance Testing J. Lohmeyer 3203[9/15/92]
92-168R0.PDF ATA Download Microcode Command J. P. McGrath 165340[9/15/92]
92-168R1.PDF ATA Download Microcode Command J. P. McGrath 483322[8/15/93]
92-169R0.PDF Conformance Testing Presentation R. Bailly 2071392[9/15/92]
92-170R0.PDF SFF pinouts for SPI annexes D. Allan 1680561[9/15/92]
92-171R0 Presentation on SBP at August Plenary E. Gardner Missing[ ]
92-172R0.TXT Letter to K. McMillan on Letter Ballot Proceedure L. Lamers 1443[9/15/92]
92-173R0.TXT Letter to K. McMillan on E-mail use L. Lamers 2309[9/15/92]
92-174R0.TXT Minutes of July 13, 1992 Grass Roots Meeting M. Freeman 9915[9/15/92]
92-175R0.PDF Letter Ballot J. Lohmeyer 9921[9/15/92]
92-176R0.PDF Letter Ballot J. Lohmeyer 9828[9/15/92]
92-177R0.PDF Letter Ballot J. Lohmeyer 9828[9/15/92]
92-178R0.PDF Letter Ballot J. Lohmeyer 9830[9/15/92]
92-179R0.PDF Letter Ballot J. Lohmeyer 9828[9/15/92]
92-180R0.PDF Letter Ballot J. Lohmeyer 9841[9/15/92]
92-181R0.PDF Terminator & Driver Characteristics D.W. Spence 29087[9/15/92]
92-182R0.PDF working draft SCSI-3 Fibre Channel Protocol (FCP) R. Snively 5229279[9/15/92]
92-182R2.PDF working draft SCSI-3 Fibre Channel Protocol (FCP) R. Snively 5344452[11/15/92]
92-182R3 working draft SCSI-3 Fibre Channel Protocol (FCP) R. Snively Missing[ ]
92-182R4 working draft of SCSI-3 Fibre Channel Protocol (FCP) R. Snively Missing[ ]
92-183R0.PDF Current Sink for ATA drivers Operating at 3.3 volts J. W. McGrath 284142[9/15/92]
92-184R0.TXT Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie 6944[11/15/92]
92-184R1.TXT Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie 7277[3/15/93]
92-184R2 Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie Missing[ ]
92-184R3.TXT Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie 6470[6/15/93]
92-184R4.PDF Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie 1222432[10/15/93]
92-184R6.TXT Codes, ASC, ASCQ, & Values Committed in SCSI-3 G. Penokie 7077[12/15/93]
92-185R0.PDF Format Track Definition for ATA L. Leach 431695[11/15/92]
92-185R1.PDF Format Track Definition for ATA L. Leach 11403[3/15/93]
92-186R0.PDF Response to Public Review Comment #1 on BSR X3.221, ATA D. Shoemaker 3434[11/15/92]
92-187R0.PDF Response to Public Review Comment #2 on BSR X3.221, ATA D. Shoemaker 279933[11/15/92]
92-187R1.PDF Response to Public Review Comment #2 on BSR X3.221, ATA J. Lohmeyer 3283[ ]
92-188R0.PDF Response to Public Review Comment #3 on BSR X3.221, ATA D. Shoemaker 3383[11/15/92]
92-189R0.PDF Response to Unregistered Public Review Comment on BSR X3.221, ATA D. Shoemaker 3577[11/15/92]
92-190R0.PDF Response to Unregistered Public Review Comment on BSR X3.221, ATA D. Shoemaker 3464[11/15/92]
92-191R0.PDF Response to Unregistered Public Review Comment on BSR X3.221, ATA D. Shoemaker 3296[11/15/92]
92-192R0.PDF Jeopardy Letter for September 1992 J. Lohmeyer 38614[11/15/92]
92-193R0.PDF Minutes of ATA September '92 Working Group Meeting Lamers/Lohmeyer 7794[11/15/92]
92-194R0.PDF Minutes of X3T9.2 September '92 Working Group Meeting Lamers/Lohmeyer 19901[11/15/92]
92-195R0.PDF Small Form Factor ATA Annex Dal Allan 659777[11/15/92]
92-196R0.PDF Small Form Factor SPI Annex Dal Allan 1535459[11/15/92]
92-197R0.PDF IEEE P1285 Liaison Report Dennis Pak 705852[11/15/92]
92-198R0.TXT Proposal for Funding X3T9.2 Technical Editors John Lohmeyer 2971[11/15/92]
92-199R10 working draft of SCSI-3 Serial Bus Protocol (SBP) Gerald Marazas Missing[ ]
92-199R6 SCSI-3 Serial Bus Protocol Gerald Marazas Missing[ ]
92-199R9.PDF working draft of SCSI-3 Serial Bus Protocol (SBP) Gerald Marazas 364902[ ]
92-200R0.PDF Minutes of X3T9.2 Plenary Meeting #102 Lamers/Lohmeyer 11217641[11/15/92]
92-200R1.PDF Minutes of X3T9.2 Plenary Meeting #102 Lamers/Lohmeyer 82775[ ]
92-201R0.PDF OASIS Update Daniel Arnold 298745[11/15/92]
92-202R1.PDF SAM Addressing Proposal Charles Monia 404015[11/15/92]
92-203R0.TXT SPI Working Group Minutes for October 1992 Lamers/Spence 9496[11/15/92]
92-204R0.TXT Minutes of Grass Roots Meeting #2 -- 10/1/92 Lamers/Freeman 8365[ ]
92-204R2.PDF Minutes of Grass Roots Meeting #2 -- 10/1/92 Lamers/Freeman 1482964[1/15/93]
92-205R0.PDF ATA letter ballot on pr responses l. lamers 9788[11/15/92]
92-206R0.PDF CAM-2 letter ballot L. Lamers 9693[11/15/92]
92-207R0.PDF Letter on International Participation Fee L. Lamers 3480[11/15/92]
92-208R0.PDF Call for X3T9.2 Chairmen D. Arnold 713146[11/15/92]
92-209R0.PDF Call for X3T9.2 Vice-Chariman D. Arnold 636430[11/15/92]
92-210R0.PDF Proposed Cable Preperation Procedure Tom Debiec 2425[11/15/92]
92-211R1.PDF Jeopardy Letter for Meeting Attendance J. Lohmeyer 36881[1/15/93]
92-212R0.PDF Request for Interpretation - SCSI-2 Synch Transfers Junzo Neriishi 288881[11/15/92]
92-213R0.PDF Project Proposal for Serial Storage Architecture - Physical (SSA-PH) J. Scheible 10556[11/15/92]
92-214R0.PDF Queue Full Handling R. DeKonig 31249[1/15/93]
92-215R0.PDF 50 line to 68 line connections for SPI B. Ham 617776[1/15/93]
92-216R0.PDF Where does SPI really fit in SCSI B. Ham 251835[1/15/93]
92-217R0.PDF SCSI Caching Large Segment Control G. Milligan 12896[1/15/93]
92-217R1.TXT SCSI Caching Large Segment Control G. Milligan 8240[3/15/93]
92-218R1.PDF Global Logging Target Save Disable Bit G. Milligan 15787[1/15/93]
92-219R1.TXT Proposal for Hot Plug Leakage Current Specification T. Asami 8875[1/15/93]
92-220R0.PDF Differential Test Ciruit Modifications J. Goldie 1607521[1/15/93]
92-221R0.TXT Resolving the ATA Multi-word DMA Timing J. Geldman 4674[1/15/93]
92-222R0.TXT Minutes of ATA November '92 Working Group Meeting Lamers/Allan 6603[1/15/93]
92-223R0.TXT Minutes of RAID November '92 Study Group Meeting Lamers/Penokie 9116[1/15/93]
92-224R0.TXT Minutes of November '92 General Working Group Meeting Lamers/Lohmeyer 18275[1/15/93]
92-225R0.PDF SCSI-3 Primary Commands - Working Document Outline R. Weber 1020874[1/15/93]
92-225R1.TXT SCSI-3 Primary Commands - Working Document Outline R. Weber 5961[12/15/93]
92-226R0.PDF SCSI-3 Primary Commands - Approved Additions R. Weber 639692[1/15/93]
92-226R1.TXT SCSI-3 Primary Commands - Approved Additions R. Weber 4194[12/15/93]
92-227R2.PDF Revised SAM Model C. Monia 1979872[1/15/93]
92-228R0.PDF SCSI-3 SBP Tap Fetch Ordering Example E. Gardner 38380[1/15/93]
92-229R0.PDF Minutes of X3T9.2 Plenary Meeting #103 Lamers/Lohmeyer 84579[1/15/93]
92-230R0.TXT Minutes of X3T9.2 RAID Study Group Meeting #2 Lamers/Penokie 9986[1/15/93]
92-231R0.PDF SCSI-2 Options Selection Document G. Stephens 7265046[1/15/93]
92-232R0.PDF IEEE P1285 Liason Report D. Pak 645946[1/15/93]
92-233R0.PDF SSA Liason Report J. Scheible 961633[1/15/93]
92-234R0 not used (duplicate doc number for 92-136) Missing[ ]
92-235R0.PDF Clarification of Synchronous Handshake L. Lamers 6128[1/15/93]
92-236R0.PDF Test Procedure for Maximum Signal Capacitance D.W. Spence 3147[1/15/93]
92-237R0.PDF Proposed New Wording for Terminator Power D.W. Spence 9515[1/15/93]
92-238R0.PDF CAM-2 Study Group Report B. Dallas 5281[1/15/93]
92-239R0.PDF PraireTek Patents/ANSI Patent Policy Gerald B. Rosenberg 314986[1/15/93]
92-240R0.PDF Letter to CBEMA on US Design SCSI-2 Comment Chuck Duquette 602163[1/15/93]
92-241R0.PDF Jeopardy Letter for Letter Ballots J. Lohmeyer 36167[1/15/93]
92-242R0.PDF Letter to Toshiba on Request for Interpretation J. Lohmeyer 36852[1/15/93]
92-243R0.PDF Letter Ballot for ATA second public review J. Lohmeyer 9790[1/15/93]
92-244R0.PDF Letter to Del on SCSI-3 Project Proposals J. Lohmeyer 69642[1/15/93]
92-245R0.PDF Comments for the CAM group of the SCSI X3T9 R. Jesup 12707[1/15/93]
92-246R0.PDF AT Attachment Interface for Disk Drives I. Dal Allan 18393395[1/15/93]

(This page was last updated on 2015/11/05 at 19:56:28.)

[Return to the X3T9.2 home page.]

For more information or if you have comments on this page contact the T10 Webmaster